Electrical contracting company hiring 500 craft workers, BIM, project managers, and office staff
October 11, 2021
Construction on Facebook’s Mesa Data Center has begun in Mesa’s Elliot Road Tech Corridor. The project aims to serve as a model of energy efficiency and will be supported by 100% renewable energy from new solar energy plants.
Each year it seems wildfire season grows in both longevity and severity. In California alone, Cal Fire estimated the season has increased by 75 days, and some experts believe the threat of wildfires is now year-round instead of during the traditional May to October timeline.
Data centers fail on a regular basis. Fortunately, built-in redundancy, extensive commissioning, and startup staff training means operations are not interrupted as frequently.
Since the beginning of 2020, people have been forced to reckon with the grim reality that we are all vulnerable, and crises can come in many unpredictable forms.
Intermittent Wi-Fi problems, long travel times, and delayed resolutions are costly for distributed enterprises. Wi-Fi automation platforms deliver the analytics and insights needed for proactive, assured optimization, no matter where networks are located.
Now that the pandemic is starting to subside, many companies are looking to understand the lessons learned and ensure their IT systems are more robust and stable.
Learn more about the Top Tier Products available in batteries, cabinets, cables/cable management systems, IT equipment, power systems and products, racks, security systems, software, thermal management solutions, and UPS systems.
Power protection systems, energy storage, power distribution units (PDUs), static transfer switches, cooling systems, power sensors, and remote power panels (RPPs) all play a vital role in ensuring power is available 24/7.