In today’s complex data center environment, operators must continuously juggle multiple integrated mechanical, electrical, and data systems to minimize the risk of critical failure.
Design collaboration between the owner/operator and the electrical and mechanical engineers in the design and construction processes of two large Sabey Data Center Campuses—one in East Wenatchee, WA, and the other in Ashburn,VA—was key to the success of the projects.
Building an efficient data center requires significant analysis of a number of factors, including the number and type of servers needed, expected power usage, cooling requirements, airflow design, footprint, layout, cabling paths, and more.
Helping companies plan, design, operate, and eventually refresh or repurpose their data centers more efficiently and effectively is a core part of Eaton Corporation’s mission.