The web-scale IT concept is derived from large service provider environments, which demand massive compute and storage capacity coupled with lightning-fast speed and agility.
The increased focus on efficiency within the data center world brings higher demands for thoughtful, well-planned spaces to house current IT equipment with consideration given to future needs.
Having the latest in equipment and technology is important for business-critical data centers. Yet, simply having these things is only one step in optimizing performance.
On a recent project status call an engineering firm’s mechanical engineer stated, “We always design for the worst case.” The focus of the call was to troubleshoot operational problems associated with an air handler that was experiencing problems due to low load conditions.
Recently I was participating on a panel at the Data Center Summit in San Francisco. The panel consisted of Michael Rechtin, moderator from Baker McKenzie, with additional panelist Jason O’Connell from Infinity SDC, as well as panelists from Equinix and Structure Research.
Leading signal transmission provider will use 6SigmaDCX to help mission critical customers reduce risk and increase efficiency.
March 30, 2016
Future Facilities North America (Future Facilities NA) has announced that Belden, a global leader in signal transmission solutions for mission critical applications, has tapped Future Facilities for its Computational Fluid Dynamics (CFD) modeling and simulation software.